Moscow, Yuzhnoye Butovo
Maximum Sports Complex
General construction, MEP systems and full BIM coordination at the Maximum sports complex in Moscow's Yuzhnoye Butovo: pools, an ice arena and a gym.
- Design & BIM
- HVAC
- Power supply

Maximum is a city sports complex in Yuzhnoye Butovo with an ice arena, swimming pools and a fitness hall. Sobko Group carried out general construction and installed engineering systems with full BIM coordination.
What we did
- General construction works.
- Installation of engineering systems.
- Full BIM coordination of all disciplines.
Conditions
- A fast-track project with tight deadlines.
- A large multifunctional facility: pools, ice rink and gym.
Result
Commissioning in Q2 2025 and phased opening in summer 2025. The critical path was delivered without delays, and the facility is ready for year-round operation.
Interesting facts
- Maximum is one of the first city facilities with a drowning alert system.
- The ceiling of the pool hall is 13.6 m high.
- The ice arena on the ground floor is used for training, district competitions and public skating.




