This section is coming soon. Write to us and we'll tell you more.
Lakhta Center
Fire alarm, voice evacuation and automation installed and commissioned on office floors of Europe's tallest tower.
This section is coming soon. Write to us and we'll tell you more.
We design, build, install engineering systems and supply equipment. One team and one point of responsibility, from the first sketch to handover.
Every building is assembled in a digital model first. Architecture, structure and all engineering disciplines are designed in parallel in one data environment: clashes are found and resolved before work starts on site, and shop drawings are ready for installation.
Air, cooling and heating set the comfort of every floor. We calculate loads for the site's climate, from a Moscow winter to Dubai heat, select energy-efficient equipment and hand the systems over fully balanced and documented.
The building's power, from the grid connection to every socket. We design and install substations, main switchboards, busbars and cable routes, lighting and lightning protection, with redundancy wherever a failure is not an option.
The nervous system of the building. Cabling, communications, CCTV and access control, fire alarm, voice evacuation and fire suppression are designed together, work as one system and are handed over to the authorities with a full set of test reports and as-built documentation.
Every system converges into one brain. The BMS collects data from ventilation, power, safety and utilities, controls them and shows the building's status 24/7 to the operators and the client.
Construction, fit-out and installation run in sync with supply, so the site never waits a single day. We hand over with as-built documentation, trained staff and transparent reporting at every stage.
Design, supply, construction and installation under a single contract. Fewer interfaces between contractors, one point of responsibility, a predictable schedule and budget.
Architecture, structure, MEP and interiors. BIM modelling with clash detection and shop drawings ready for site.
HVAC, power, low-voltage, security and automation. Designed, installed and commissioned by one team.
General contracting from excavation to commissioning, premium fit-out, reconstruction without stopping operations.
We maintain the electrical and low-voltage systems of operating buildings: scheduled inspections and preventive care, checks of fire alarm, CCTV and access control, emergency call-outs, so the building keeps working as it did on handover day.
Equipment, special and road-building machinery and spare parts of global brands through reliable foreign partners: sourcing, customs, documents, delivery.
Legal support and arbitration, cross-border deals, finance, sales departments and AI-driven business process automation, from a team that builds and closes deals itself.
Goals, budget, constraints and first technical solutions.
All disciplines in one model, clashes resolved.
Equipment from leading manufacturers, delivered on time.
Works follow the delivery schedule, so crews don't wait for equipment.
Testing, balancing, staff training.
As-built documentation and a working building.
Towers, arenas, resorts, business parks, healthcare and industrial projects. Each card shows our scope of work.
Fire alarm, voice evacuation and automation installed and commissioned on office floors of Europe's tallest tower.
One of the largest-capacity hockey arenas in the world. Low-voltage systems: fire alarm, voice evacuation, CCTV, access control and structured cabling.
Four towers up to 98.5 m and an office building. Power, low-voltage, ventilation and common-area finishing: over 250 km of cable.
Five-star seafront resort in Sirius. Fire alarm, voice evacuation and smoke control for the hotel and 319 apartments.
Electrical works at an operating refinery: power and lighting for a new administrative complex, 53 km of cable lines.
Power and lighting for the podium of a Class A business park: 88 switchboards, 1,450 luminaires and about 183 km of cable.
Ventilation, smoke control and VRF air conditioning for a Moscow outpatient clinic rebuilt from the ground up.
Electrical works in a clinic after major repair: about 470 luminaires, 23 panels and 45 km of cable lines.
Electrical works in the largest clinic renovated to the new Moscow standard: 72 km of cable, 13 km of trays and 32 panels.
Low-voltage systems in the historic building on Novaya Square: fire alarm, access control and structured cabling during restoration.
Premium apartment finishing and smart home systems in a skyscraper: large-format porcelain, flush doors, KNX control.
Ventilation automation at a pharmaceutical plant: 89 systems, 185 variable speed drives and 117 km of cable.
Electrics and 16 low-voltage systems for a 20-storey building with 171 apartments.
A new addressable fire alarm in an operating building: over 2,000 detectors and 17.5 km of fire-resistant lines. Work in progress.
Ventilation, air conditioning and power for an office floor in a Class A business centre. Work in progress.
Electrical works on six office floors: over 58 km of cable, 3,200 luminaires with DALI control and socket busbars.
2,000 A and 2,500 A busbar trunking in an operating building, installed at night and at weekends. Work in progress.

The honour of partnership is worth more than profit, and a word is stronger than stone.
We enter a project as a partner and leave it as a trusted friend clients come back to. Every specialist on the team is proven in practice.
RTA and Skyports completed the Dubai Marina vertiport, certified by the GCAA. It handles up to 84,000 passengers a year and links to DXB in under 10 minutes.
ReadDubai's Executive Council approved a AED 9.59bn plan for community facilities to 2040 and a AED 2bn Metro extension to Al Maktoum Airport City, due in 2031.
ReadDubai Municipality has updated planning rules for Al Satwa: G+2 on internal roads, retail with flats on external roads and G+8 on plots of 1,000 m² or more.
ReadAny format of cooperation: from subcontracting to joint ventures, from one direction to the full cycle, on site or remotely.