Mantera Supreme Seaside: fire alarm and smoke extraction

Fire alarm, voice evacuation and smoke control at Mantera Supreme Seaside, a five-star seafront resort in Sirius: 3,070 detectors, 2,180 loudspeakers.

  • Low-voltage systems
The entrance to the Sirius Conference Center of Mantera Supreme Seaside in the evening

The project in numbers

over 3,070fire detectors
over 2,180voice evacuation loudspeakers
over 126 kmof cable lines
319apartments

Based on the working documentation of the systems our team installed

Mantera Supreme Seaside is a five-star resort on the Black Sea front in Sirius, next to the Olympic Park. The first phase of the complex is a 400-room hotel with a conference centre and the Mantera Seaview Residence apartments. Our team installed the fire protection systems: fire alarm, voice evacuation and smoke control automation.

Our scope

  • Addressable fire alarm in the apartments and the hotel.
  • Voice evacuation: loudspeakers, illuminated signs and cable lines.
  • Two-way communication between lift lobbies, refuge areas and the fire control room.
  • Smoke control automation in the apartments of block B.
  • As-built documentation.

Systems

Fire alarm

About 3,070 addressable smoke, heat and multi-sensor detectors, 126 manual call points, 320 sounder-beacons in the apartments and about 42 km of fire-resistant cable.

Equipment: Siemens Cerberus PRO: FC726 and FC724 panels, OOH740, OP720 and HI720 detectors

Voice evacuation

About 2,180 ceiling, wall and weatherproof horn loudspeakers, 31 amplifiers and about 485 illuminated exit and direction signs. About 84 km of voice evacuation cable, including fibre links between the buildings.

Equipment: TOA VX-3000, Molniya-24 ULTRA signs

Refuge area communication

96 call stations in lift lobbies and refuge areas, connected to the fire control room.

Equipment: TOA N-8000

Smoke control automation

About 160 smoke damper control modules and 68 manual release buttons in the three buildings of block B.

Equipment: Rubezh, R3 protocol

How the work went

  1. A start by the sea. In March 2024 the crew arrived on site and began installation in the apartments of blocks A and B.
  2. 319 apartments under control. Progress was tracked for every apartment, and completed work was handed over every week.
  3. The hotel. We laid fire alarm lines and rerouted voice evacuation lines in the hotel building.
  4. Documentation. We prepared the as-built drawings and handed the systems over to the client.

What made the project special

  • On the seafront. Weatherproof horn loudspeakers serve the hotel's outdoor areas.
  • Alongside the finishing trades. Detectors and speakers were set out on the luminaire axes of the ceiling design, taking care of the finished surfaces.
  • Scale. Six apartment buildings of 6 to 8 floors and an eight-storey hotel.
  • A travelling crew. Up to 20 installers on site in Sirius.

Interesting facts

  • The resort welcomed its first guests on 25 December 2024. The Mantera group calls it the largest premium project in Sochi since the Olympics.
  • Seawater for the pools is drawn from a depth of 65 metres.
  • From above, the hotel building looks like a seagull with its wings spread.
  • The resort's subtropical park has about 15,000 plants, including a four-tonne bottle tree from Spain.

Photos: Lestest, Wikimedia Commons, CC BY-SA 4.0