1. Home
  2. News

Industry news

Dubai allows G+8 apartment buildings in Al Satwa under new rules

Dubai Municipality has updated planning rules for Al Satwa: G+2 on internal roads, retail with flats on external roads and G+8 on plots of 1,000 m² or more.

2 min read

Source: The National, 1 November 2026

Street junction in Al Satwa with low-rise buildings and high-rise towers behind

Dubai Municipality has updated the planning rules for Al Satwa, an old low-rise district between Jumeirah and Bur Dubai. The rules were announced on 1 November 2026. Plots of 1,000 m² or more can now be built up to a ground floor plus eight residential floors (G+8), and owners can merge smaller plots to reach that size.

What the new rules allow

The rules depend on where a plot sits:

  • Internal roads: a ground floor and two residential floors (G+2). Older rules mainly allowed attached villas.
  • External roads: a commercial ground floor with two or three residential floors, depending on location and planning requirements.
  • Plots of 1,000 m² or more: a ground floor and eight residential floors (G+8).

Two or more plots can be consolidated to reach the 1,000 m² threshold, and the access lanes between them can be included. The municipality says it assessed infrastructure and traffic with the relevant authorities before issuing the rules. Applications and details go through the Build in Dubai platform.

Mansour Al Rais, director of the Executive Planning Department at Dubai Municipality, said the change gives landowners "greater flexibility to redevelop their properties".

What changes on the ground

Al Satwa has stayed largely outside Dubai's building boom. The new framework turns many villa plots into sites for apartment buildings with shops at street level. That means demolition, plot consolidation and a wave of mid-rise projects, each needing new connections to power, water and drainage.

For owners and developers, three things matter early:

  1. Plot strategy. The jump from G+2 to G+8 depends on reaching 1,000 m². Talks with neighbours about merging plots come before any design work.
  2. Utility capacity. A G+8 building with retail needs far more electrical and cooling load than the villas it replaces. Capacity requests should start at concept stage.
  3. Mixed use. Shops below flats mean separate metering, fire separation, ventilation for food outlets and service routes that do not cross residential areas.

Sources

Read also: Dubai awards AED 3bn in contracts to expand its stormwater network. How we coordinate building services from design to handover is explained in Full-cycle engineering.

  • Dubai Municipality
  • Al Satwa
  • planning regulations
  • redevelopment
  • Dubai construction

Photos: Challiyan, Wikimedia Commons, CC BY-SA 3.0