Moscow

STONE Towers, Tower B

Ventilation, air conditioning and electrical works on an office floor of STONE Towers business centre in Moscow: 56 fan coils, 327 diffusers and 14.7 km of cable.

  • HVAC
  • Power supply
The STONE Towers quarter on Bumazhny Proezd: towers C and D, with the entrance to Tower B on the left

The project in numbers

over 1,020 m²of ductwork
over 56York fan coils
over 327diffusers
over 14.7 kmof cable

Planned scope of our works on the floor, based on the working documentation

STONE Towers is a Class A office quarter on Bumazhny Proezd in Moscow. Its second phase, the 23-storey Tower B and the 10-storey Tower C, was completed in December 2024. Our team is now installing the building services on the 18th floor of Tower B, which will become a corporate office: ventilation, air conditioning and power supply.

Our scope

  • General supply and exhaust ventilation of the floor.
  • Smoke control: fire dampers, smoke dampers and fire protection of ductwork.
  • Chilled water cooling with fan coils and condensate drainage.
  • Air conditioning of technical rooms, air purification and humidification.
  • Power supply: panels, cable routes, socket circuits, emergency lighting, underfloor heating.
  • Commissioning.

Systems

Ventilation

About 1,020 m² of galvanised ductwork with fittings, 95 m of flexible acoustic ducts and about 708 m² of thermal insulation. 327 slot, swirl and linear diffusers and 144 control dampers.

Equipment: TROX and Invisiline diffusers, Arktos dampers, Sonoduct ducts, K-Flex insulation

Smoke control

13 fire dampers and 2 smoke dampers, and about 62 m² of EI 60 fire protection on ductwork.

Equipment: Sigma-Vent dampers, Tizol fire protection

Chilled water cooling

56 York fan coils with plenum boxes and controllers, about 657 m of insulated chilled water pipework, 395 m of condensate drainage with pumps and 52 balancing valves with actuators.

Equipment: York, Ridan, Danfoss, Sauermann

Air conditioning and air quality

Two split systems for technical rooms, four air purifiers and a steam humidifier.

Equipment: LG, Carel humiSteam, AktivTek

Power supply

Five floor panels, about 14.7 km of cable, 468 m of cable trays, 82 floor boxes, GIRA sockets and switches, emergency lighting and underfloor heating.

Equipment: Systeme Electric, IEK, DKC, GIRA, DEVI

How the work is going

  1. The start. In early September 2026 we took over the work front on the 18th floor, and the crew moved onto the floor.
  2. Air and cooling. We are installing ductwork, fan coils and chilled water pipework, the backbone of the future office's climate.
  3. Electrics. The next stage is panels, cable routes and GIRA wiring devices.
  4. Commissioning. We will commission the systems and hand them over with the as-built documentation.

What makes the project special

  • An operating business centre. Noisy work only in the evenings and at weekends, deliveries at night, hot work under a permit.
  • Tower logistics. All equipment goes up to the 18th floor by the service lift, on the building manager's schedule.
  • A corporate office. The systems must work quietly and unobtrusively: slot and linear diffusers, fan coils hidden in the ceiling.

Interesting facts

  • The STONE Towers quarter was designed by Tsimailo Lyashenko & Partners.
  • The second-phase towers have glass-fibre reinforced concrete facades, and the offices have openable windows.
  • Ceilings in Tower B offices are at least 3.65 m high, with an 8.4 × 8.4 m column grid.
  • The art installation "Angel" stands in front of the towers.